Village of Lima
The Village of Lima partnered with GreenSpark solar for their 447.12 kW system. The project is owned by Kendall Sustainable Infrastructure, with the Village of Lima entering a 25-year solar power purchase agreement (PPA).
The Village of Lima partnered with GreenSpark solar for their 447.12 kW system. The project is owned by Kendall Sustainable Infrastructure, with the Village of Lima entering a 25-year solar power purchase agreement (PPA).
Solar power projects are more flexible than ever, benefiting a wider variety of customers and industries. Whether your business operates out of owned or leased commercial space, there are cost-effective solar energy opportunities available. 1) Does your business pay a utility bill? The account paying the utility bill has the ability to benefit from solar energy. If your business does not currently pay the electric bill, it is possible to work with your landlord and utility in order to switch the account. 2) Will your landlord allow solar panels on the property? Don’t worry, even if the answer is ‘no,’…
Bateman Orthodontics utilizes their 35.1kW solar array to power their practice in Rochester, NY. Interested in what we can do for you? Let's talk. Go Back See More
GreenSpark has installed three renewable energy projects for HARBEC and the community, in the Wayne Industrial Sustainability Park (WISP) complex. The projects include a 248kW solar array, 258kW solar array, and an 850kW wind turbine. The wind turbine helps to power the sustainable micro-grid, which powers HARBEC, GreenSpark Solar, and several other offices in the WISP complex. Interested in what we can do for you? Let's talk. Go Back See More
As part of its commitment to 100% renewable energy by 2050, General Motors contracted GreenSpark Solar to develop, design, and install a 465kW solar array at its plant in Rochester, NY.
The Town of Irondequoit received funding for two solar projects through NYSERDA’s Clean Energy Communities Program. GreenSpark Solar provided the turnkey solar package for the projects, installing the 55.8kW system at the Public Safety Building and the 74.4kW system at the Town’s new Department of Public Works building.Photos: Christa Construction Interested in what we can do for you? Let's talk. Go Back See More
This 645.84kW solar array for the Village of Brockport offsets the electricity needs of multiple buildings, including Seymour Library, three fire stations, the visitor center, Department of
Funded by NYSERDA, this 372kW array was completed in 2015 for MacArthur Elementary. Located on the south side of Binghamton, NY.
Learn more about solar for your business with these four answers from our experts.
GreenSpark Solar developed, designed, and installed a 2.3 MW solar array for RIT.