Corning Inc.
‘Corning has added five long-term community solar agreements with Kendall Sustainable Infrastructure for solar projects engineered and constructed by GreenSpark Solar. Corning functions as an anchor-off-taker on these community solar
GreenSpark is proud to support organizations throughout New York State in their transition to solar energy. Explore a sampling of the work we’ve completed for other organizations in your industry.

‘Corning has added five long-term community solar agreements with Kendall Sustainable Infrastructure for solar projects engineered and constructed by GreenSpark Solar. Corning functions as an anchor-off-taker on these community solar

As part of its commitment to 100% renewable energy by 2050, General Motors contracted GreenSpark Solar to develop, design, and install a 465kW solar array at its plant in Rochester,

GreenSpark has installed three renewable energy projects for HARBEC and the community, in the Wayne Industrial Sustainability Park (WISP) complex. The projects include a 248kW solar array, 258kW solar array,

Mastercraft Decorators, a leading manufacturer in Rochester, NY, turned to solar power to fuel their expansion into a larger facility in 2024. By partnering with GreenSpark Solar to install a

GreenSpark Solar and Redaptive are transforming Rochester’s telecommunications sector by installing a 419kW roof-mounted solar array on a call center. This initiative will significantly cut costs and greenhouse gas emissions,

Leading the Clean Energy Charge for Rochester-Area Businesses In 2024, SimuTech Group, a Rochester-based engineering consultancy, made a bold leap into sustainable energy by installing a 90.21 kW rooftop solar

Powering Cornell University’s Residence Halls with Solar Energy In 2020, Cornell University, located in Ithaca, New York, announced a 1 megawatt power purchase agreement to construct five solar arrays on

Funded by NYSERDA, this 372kW array was completed in 2015 for MacArthur Elementary. Located on the south side of Binghamton, NY.

GreenSpark Solar was hired for the Engineering, Procurement, and Construction of this 335kW solar array and integrated 392 kWh energy storage project on the rooftop of the Goergen Athletic Center

Hilton Family Dentistry made the switch to solar in 2019 with a 24kW roof-mount array installed by GreenSpark. The project received funding from NYSERDA’s NY-Sun program.

GreenSpark worked with Rochester Regional Health on a 5.4873 MW solar array that powers over 100 of their smaller buildings. GreenSpark’s role in the project included Engineering, Procurement, and Construction.

Based in the Village of Webster, Zugner & Pedersen Dental Group specializes in General Dentistry, Implant, and Cosmetic Dentistry. Their project not only includes a 28.2kW solar array on the

The installation in Sodus, NY is expected to cover over 100% of Cherry Lawn’s electric load while saving over $26,000 annually, and $650,000 over the life of the array. The

Long Acre Farms: Small Business Grows Sustainably with Solar Energy In 2015, Doug and Joan Allen of Long Acre Farms partnered with GreenSpark Solar to install a 72.8 kW ground-mounted

When rising energy costs put pressure on Russell Farms’ cold storage operations, this sixth-generation farm turned to solar to protect its bottom line—and its future. Learn how GreenSpark, as EPC

Completed in 2015, this 20.67 kW roof mount installation in Williamson, NY for our friends at Young Sommer Winery covers 100% of the winery’s electric load with a lifetime savings of

The 270 on East Apartments project in Rochester, NY consists of a 73kW roof-mount solar array installed by GreenSpark in 2022. The project is owned by Dyno Group, a Licensed

Johnson Park Center (JPC) has taken a bold step toward sustainability by powering its new Johnson Park Green Community Apartments in Utica, NY, with solar energy. GreenSpark Solar’s C&I division

Mark IV Enterprises, one of the largest locally-based real estate developers and property management firms in the Greater Rochester area, hired GreenSpark for their 132.7 kW solar array completed in

The Town of Geneva partnered with GreenSpark Solar to install an 85.65 kW ground-mount array, offsetting all municipal electricity, saving $10K annually, and building on its climate leadership.

The Town of Irondequoit received funding for two solar projects through NYSERDA’s Clean Energy Communities Program. GreenSpark Solar provided the turnkey solar package for the projects, installing the 55.8kW system

Williamson became the first town in the state of NY to supply 100% of all municipal loads with its 1.5 MW solar array.

This 645.84kW solar array for the Village of Brockport offsets the electricity needs of multiple buildings, including Seymour Library, three fire stations, the visitor center, Department of

The Village of Lima partnered with GreenSpark solar for their 447.12 kW system. The project is owned by Kendall Sustainable Infrastructure, with the Village of Lima entering a 25-year solar

Village of Sodus Point Project size: 270 kW Completed: 2019 The Village of Sodus Point joined a solar Power Purchase Agreement (PPA) to save the municipality more than $150,000 over

GreenSpark Solar partnered with the Community Library of DeWitt & Jamesville as EPC to design and build a 24,000 kWh rooftop solar array. Paired with a living green roof, the

https://youtu.be/8UPF6bQ-UPQ Heritage Christian Services, a non-profit agency that supports people with intellectual and developmental disabilities, offsets 100% of their electricity needs in the Rochester region with local solar power. Heritage

The Maryknoll Fathers and Brothers’ 874kW project consists of 2,184 bifacial solar panels mounted on twelve canopies covering Maryknoll’s two parking lots. Ecogy Energy is the project developer, financier and

Rochester Christian Reformed Church went solar in 2021 with a 35kW rooftop system covering about 50% of their electricity needs and saving them over $4,000 every year.
585-265-2384
176 E Main St.
Rochester, NY 14604
Sign up for updates
Privacy Policy | © 2025 GreenSpark All rights reserved.