The installation in Sodus, NY is expected to cover over 100% of Cherry Lawn’s electric load while saving over $26,000 annually, and $650,000 over the life of the array. The project utilized a short-term loan associated with federal tax credits, as well as a long term loan through their local bank. GreenSpark Solar was also successful in obtaining a grant for the owners through the USDA REAP program.

size: 158.4kW roof mount
completed: September 2015
funding: NYSERDA & USDA REAP