{"id":13088,"date":"2013-03-13T10:16:35","date_gmt":"2013-03-13T14:16:35","guid":{"rendered":"http:\/\/suncommon.com\/?p=13088"},"modified":"2018-08-28T19:42:07","modified_gmt":"2018-08-28T19:42:07","slug":"wayne-industrial-sustainability-park","status":"publish","type":"post","link":"https:\/\/greensparksolar.com\/es\/2013\/03\/13\/wayne-industrial-sustainability-park\/","title":{"rendered":"Parque industrial de sostenibilidad de Wayne"},"content":{"rendered":"<h1>Wayne Industrial Sustainability Park, GreenSpark Commercial Wind<\/h1>\n<p>GreenSpark dise\u00f1\u00f3, desarroll\u00f3 e instal\u00f3 un aerogenerador de 850 kW en HARBEC Plastics, en el Wayne Industrial Sustainability Park (WISP) de Ontario, Nueva York, en diciembre de 2012. Este fue el primer proyecto que GreenSpark finaliz\u00f3 en el marco de la asociaci\u00f3n con Harvest the Wind Network.<\/p>\n<p>GreenSpark traslad\u00f3 algunas de sus oficinas al WISP en 2008 y, por tanto, aprovecha los beneficios de la segunda turbina e\u00f3lica, que funciona conjuntamente con una turbina e\u00f3lica preexistente de 250 kW que HARBEC instal\u00f3 hace m\u00e1s de diez a\u00f1os. Se calcula que el aerogenerador de 850 kW producir\u00e1 unos 1,75 millones de kWh en los pr\u00f3ximos 25 a\u00f1os o m\u00e1s.<\/p>\n<p>Empresas de todos los tama\u00f1os han aprovechado <a href=\"http:\/\/greensparksolar.com\/es\/commercial\/\">energ\u00eda limpia y local para ayudar a alimentar sus negocios<\/a>. Nuestra variedad de opciones facilita a las empresas el cambio sostenible a la energ\u00eda limpia.<\/p>","protected":false},"excerpt":{"rendered":"<p>Wayne Industrial Sustainability Park, GreenSpark Commercial Wind GreenSpark designed, developed, and installed a 850kW wind turbine at HARBEC Plastics in the Wayne Industrial Sustainability Park (WISP) in Ontario, NY in December 2012. This was the first project that GreenSpark finished under the partnership with Harvest the Wind Network. GreenSpark moved some of their\u00a0offices into the [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":21512,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[5,103,4],"tags":[40,41],"class_list":["post-13088","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-commercial","category-installation","category-news","tag-wind","tag-wind-power","entry","has-media"],"_links":{"self":[{"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/posts\/13088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/comments?post=13088"}],"version-history":[{"count":4,"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/posts\/13088\/revisions"}],"predecessor-version":[{"id":20018,"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/posts\/13088\/revisions\/20018"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/media\/21512"}],"wp:attachment":[{"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/media?parent=13088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/categories?post=13088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/greensparksolar.com\/es\/wp-json\/wp\/v2\/tags?post=13088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}